Skip to main content

Missing? Perpetual surveillance, inspection, monitoring, maintenance of 23 Himachal dams

By Archana Vaidya, Himanshu Thakkar* 

In order to have high standards of dam safety the prerequisites are designing and constructing dams with reasonable safety margins; operating and maintaining them safely; and having emergency arrangements to address situations that might arise.
Operation of dam within its ambit also includes thorough understanding of likely impacts and its management in case of flooding, in any emergency situation or in the event of dam failure, both upstream and downstream on communities living there, their livelihoods and also on infrastructure and property which can get affected.
In fact in many countries like Sweden and in many states of the USA, a dam is assigned a dam safety class i.e. A, B or C depending upon the significance of the damage that might occur in case of dam failure, class A being assigned to dams whose failure might cause significance loss of public life and property.
Dam safety requirements are calibrated accordingly and a higher burden is put on dam owners of higher class, concerning safety management system, emergency plans, overall assessments, and annual dam safety reporting.
In November 2020 the Central Water Commission (CWC) issued guidelines for classifying the hazard potential of dams, to identify those projects whose failure or disruption could potentially lead to most severe consequences and to assist dam authorities to take appropriate measures to deal with such critical issues.
Hazard classification as per these guidelines is based upon four major categories: the capital value of the project, potential for loss of life, the potential for property damage and potential for environmental and cultural impact. Class IV is the most vulnerable and hazard prone dam and this solely is based upon the potential consequences to downstream life, properties, services and environment that would result from a failure or misoperation of the dam.
The safety of a dam facility is a combined function of the technical systems, information management, the organisation and the people responsible for operating the systems. A good dam safety law therefore should be able to regulate all these aspects adequately.
It is important to mention that in order to effectively manage the consequences in case a dam failure occurs or there is an emergency due to unprecedented flooding, apart from having a robust dam safety law, efficacy of regulation of certain other parameter are also equally important.
Land use in flood plain zones in the downstream of dams, catchment area treatment plans, preparedness of disaster management authorities and its coordination with other district administration authorities all these become extremely relevant and important factors.
In the US hazard creep is an acknowledged problem which occurs when new development downstream of an existing dam increases the hazard rating of the dam. The design flood requirements are typically based on the downstream hazard classification existing at the time of permitting and construction of the dam.
The standard requirement in most states of the USA is no development in 1-in-100 year flood zone area. Alternatives to minimize or avoid this problem include linking dam safety and floodplain regulations to limit the extent of future hazard creep, or purchase of downstream flowage easements to prevent future development. Hazard creep cannot be ignored; it must be considered and controlled. 
Many states in the US have either dam safety and flood plain regulations combined or they work in close association with each other. We do not have any mandate for dam safety officials to work with the flood plain managers in our country.
In fact, in India this species of flood plain managers do not even exist and as such and there is no clarity as to who is even responsible for demarcating these areas in the absence of a clear mandate in this regard. Both implementation and evolution of dam safety norms and development in the downstream flood plains happen in every state independently of each other despite them being interlinked.
The guidelines issued by CWC for hazard classification don’t seem to have taken cognisance of this concept. However dam break analysis is supposed to be done every five years. This analysis gives a fair idea of about damage that would be sustained in case the dam breaks and if it is done credibly and regularly then it can help identify cases of hazard creep and help take appropriate action on this.
However, there is no evidence of credible, regular updating of Dam Break Analysis, downstream river carrying capacity, inundation maps, early warning systems or disaster management plan. All of this also need to be promptly in public domain for each dam, which is not the case today for any dam.

Dam Safety Act 2021

India has a federal Dam Safety Act 2021 (DSA) to provide for dam safety all across the country. DSA has created a regulatory and institutional framework at both the central and at state level. It lays down mandatory processes and procedures to be followed by the dam owners, state dam safety organisations (SDSOs) and National Dam Safety Authority (NDSA).
Apart from standards and guidelines for regular maintenance and operation to be formulated by NDSA with recommendations from National Committee on Dam Safety (NCDS), there are specific obligations cast upon dam owners and SDSOs to deal with times of emergency, natural disaster and extreme weather conditions. 
SDSO is responsible for safe operation of all dams within its jurisdiction except the ones owned by central public sector undertaking or where a dam is an inter-state project, in such cases the functions of SDSO shall be discharged by the NDSA.
NCDS, the supreme body in the hierarchy of dam safety institutional framework, has been entrusted with specific functions enumerated in the schedule appended with the Act which includes evolving dam safety policies and recommend necessary regulations as may be required. It is required to meet twice a year, once before monsoon and can call in its meeting dam owners and experts as deemed appropriate for effective discharge of its functions.
NDSA is the operational arm of the institutional framework of dam safety at the national level and provides secretarial assistance to the National Committee and its sub-committees. NDSA is responsible for implementation of the policies made by NCDS and on its recommendations formulates regulations on various aspects of dam safety. NDSA adjudicates disputes between dam owners and SDSO or SDSOs of different states. NDSA has four regional offices.
The State Committee on Dam Safety (SCDS) has been entrusted with specific functions to prevent dam failure related disasters under this Act as per guidelines, standards and other directions on dam safety issued by the NDSA. SCDS oversees the SDSOs. The state committee is responsible for assessing potential implication of reservoir filling of a specified dam in the State on any upstream State, and also required coordinate mitigation measures with such upstream States.
It is the responsibility of the State committee to assess potential implication of failure of a specified dam in the State on any downstream State, and coordinate mitigation measures with such downstream States. DSA mandates vulnerability and hazard classification of all specified dams by SDSO and laying down of uniform criteria in this regard is to be done by NDSA.
While there is no question that India, the third largest owner of large dams in the world, urgently needs a transparent, accountable and participatory dam safety mechanism, the institutional set up formed under DSA leaves a lot to be desired.
Firstly, the institutions formed do not have any place for independent members. Secondly, CWC, the focal point of the institutions, has very poor track record. Thirdly, the act does not provide that all information related to the dam safety must be put promptly in public domain, including all the reports, minutes and agendas of all the committees and authorities formed under the DSA. Lack of transparency seems to be the norm here.
The DSA is basically focussed on structural safety of the dams, and have very little provision for operational safety of the dam. The track record of the functioning of the DSA so far although it has only been two years, does not inspire much confidence, when we see the experience with recent dam failures, both in terms of structural failures and operational failures.

Specified dams in Himachal Pradesh (HP) and HP-SDSO

In HP there are 23 specified dams, therefore the SDSO can be headed by an officer of the level of superintending engineer who reports to the technical head of the department of dam safety in the state. Out of these 23 specified dams 4 are owned by the state, nine by private companies and 10 are owned by central public undertakings for which NDSA is supposed to act as DSO.
The Directorate of Energy is the SDSO for large dams in the state and is also responsible for monitoring safety and quality control of all the HEP’s commissioned, under execution. Surveillance and inspection is the duty of the state dam safety organization which in turn reports to the state committee on dam safety.
SDSO is required to keep perpetual surveillance, carry out inspections; and monitor the operation and maintenance of each specified dam under their jurisdiction. Each dam under their jurisdiction is mandated to be classified as per such vulnerability and hazard classification criteria as may be specified by the regulations. SDSO is mandated to maintain a logbook regarding all dams containing all data related to dam inspection, surveillance and any other matter related to dam safety.
This is required to be maintained as per the regulation. SDSO is to prepare an annual report of safety status of each specified dam within three months of the end of preceding financial year. This has to be presented to the national authority and the state govt which shall present it to the state legislature.
The national authority shall consolidate a national dam safety report and present it to the central govt within six months of the expiry of the preceding financial year who in turn will lay it before each house of the Parliament. This report is also given to NDMA and has to be made available in the public domain. No such reports are known to be available at state or central level so far.

Obligations of dam owners as per DSA

There are several specific obligations that have been cast upon the dam owners under DSA. There is a chapter in DSA which deals with emergency action plans (EAP) and disaster management. Emergency management which is the objective of EAP is generally understood to mean the capacity to respond to emergencies and to mitigate their consequences. It includes anticipating the flood inflows and outflows, identifying the area that would be affected by the same, alerting such areas and having a plan to ensure timely and orderly evacuation of all such areas.
With regard to dam safety, emergency management also includes the ability to carry out actions to prevent a situation from developing into a dam failure. The emergency response aims to establish and maintain the ability to:
• Prevent the development of harmful situations.
• Issue alarms and warnings.
• Limit damage.
• Limit adverse consequences in general.
Owners of the specified dams which are regulated by DSA in India are under legal obligation to maintain certain specified scientific systems which enable them to anticipate and forecast inflow and outflow of water, forecast floods and issue early warning to people living downstream and upstream.
All such information is required to be shared not only with public authorities in the district they are located in but also need to be actively and timely disseminated to pubic in general who are likely to get affected in case of a flood.
The owners of specified dams are also mandated to compile all technical documentations concerning hydrology, dam foundation, structural engineering of dam, watershed upstream of dam, and nature or use of land downstream of dam along with information on all resources or facilities of economic, logistic or environmental importance which are likely to be affected due to dam failure.
How often this information is required to be updated is not known. There would be significant variations in HP in resources or facilities of economic, logistic or environmental importance over the years given the almost unregulated development that that we are witness to in downstream areas.

Dam safety scenario in HP

In HP 21 out of 23 hydel projects have been found to be guilty of non-compliance with dam safety norms by the state government during the July-Aug 2023 floods. Only 800 MW Kol dam in Bilaspur and 1045 MW Karcham Wangtoo project in Kinnaur followed dam safety norms and the guidelines of the NDMA and CWC.
The safety norms were either neglected or were not followed as per the standard guidelines of the DSA as per the statement of the Chief Secretary (CS) of the state. A part of the devastation could be attributed to dam authorities who did not comply with DSA and NDMA’s Oct 2015 guidelines (see Annexure A) for water release from the dam and lack of early warning systems.
The CS has asked officials to see if relevant provisions under DSA like setting up of early warning system, water release guidelines, setting up of control rooms, reservoir maintenance, emergency action plan and better communication between dam sites and power houses etc are being implemented on the ground.
The definition of offence under DSA is, either obstruction of any official or employee or person authorised by Central Government or the State Government, or a person authorised by the National Committee or the Authority or the State Committee or the State Dam Safety Organisation in the discharge of his functions or refusal to comply with any directions of any of these.
Such offences are punishable with imprisonment for a term which may extend to one year or with fine, or with both and if the same results in loss of lives or imminent danger thereof, shall be punishable with imprisonment for a term which may extend to two years. The orders though have to be complied with by dam owners in letter and spirit.
DSA also envisages a situation where an offence is committed by a govt department or is committed in connivance or with the consent of or can be attributed to the neglect of the government department, in such cases either the head of the department or a person specifically held responsible for the same can be punished. If SDSO itself is found lacking, will anyone take action against them and fix accountability?
No court can take cognizance of any offence punishable under this Act, except on a complaint made by the Central Government or the State Government or a person authorised by the National Committee or the Authority or the State Committee or the State Dam Safety Organisation, as the case may be.
Emergency management includes the ability to carry out actions to prevent a situation from developing into a dam failure
So to fix responsibility of the system is very tough but dam owners can surely be taken to task. However, this has not happened so far and let us see how the state government deals with the violations by the 21 dam operators in HP in 2023 South West Monsoon.
It is a matter of investigation as to what exactly transpired in HP which exacerbated the unprecedented floods and consequent devastation apart from extremely heavy rains. Did the dam operators follow the safety guidelines and norms to do everything possible to minimise the downstream flood impacts? 
Was there anything that dam authorities could have done which would have helped to mitigate the impact of the floods, How much time they had to react or could they have better regulated the quantum as well as timing of water discharge?
Let’s have a look at the dams on river Beas which consists of four sub-valleys named as the Kullu, the Parbati, the Garsa and the Sainj and which dams were in the eye of the storm; Malana 2, Larji and Pandoh, Parbati III and Pong. In addition to these Beas basin dams, Bhakra and other dams in Sutlej basin were also alleged to have contributed to flood disaster. All these dams are supposed to have hazard classification of III as per informal official resources.
These dams had to release the water at some stage when the dams were full, but they were supposed to follow norms to ensure that they minimized the flood damage downstream and alert the vulnerable areas.
Larji dam at the peak of rains in the recent floods got about 5,700 cubic meter per second water and its design flood has the capacity of discharge for 8,100 cubic meter per second meaning thereby the structure of the dam has been designed to withstand the flood where discharge could be up to 8,100 cubic meter per second.
As per dam experts out of 23 specified dams in the state of HP three large dams i.e. Bhakra, Pong and Kol have significantly large water reservoirs and can cause significant flooding, though others too have big dams and reservoirs with several lakh cubic meters capacity. Each of these 23 dams therefore have capacity to add to the downstream flood disaster when not operated properly.
Malana II What happened in district Kullu in Malana was however a dam failure as per the definition in DSA when the gates of the dam got jammed and the impounded water started to flow from the top of the dam and also eroded the river banks on the sides.
“Dam failure” means any failure of the structure or operation of a dam which leads to uncontrolled flow of impounded water resulting in downstream flooding, affecting the life and property of the people and the environment including flora, fauna and riverine ecology.
For the purposes of this clause, failure in the operation shall mean such faulty operations of the dam which are inconsistent with the operation and maintenance manual.
If the operation, maintenance and monitoring of the dam was happening as per the requirement of the DSA this situation could have been avoided. The overflowing of water due to jammed gates created an emergency situation as it could have damaged the structure at Malana 2 which in turn could have damaged downstream project at Malana 1.
If the dam authorities issued timely early warnings about the impending floods in view of extremely heavy, unprecedented rains in its catchment areas, could proportions of the disaster in the downstream areas have been reduced?
EAP under DSA are required to be made after a consultation process with various state departments responsible for disaster management and relief and state disaster management authority in order to have coordination and transparency amongst them all.
Owners of other dams in the immediate vicinity likely to be affected are also required to be consulted while making an emergency action plan. If such a collaborative effort is required to be made for putting EAPs in place then why don’t they deliver at the time emergency is something that we need to ponder over.
In DSA, main focus of the provisions regarding emergency action plan which are to be made by the dam owners of specified dams in the eventuality of dam failure. Though the consequences of dam failure and dam induced floods in terms of loss of life and property and its management is a part of EAP, the mandate regarding its management needs to be more robust.
The emergency action plan as per DSA is required to be put into action as and when conditions arise which are hazardous or likely to be hazardous to a specified dam or potentially hazardous to public safety, infrastructure, other property or to the environment. In HP a flood situation hazardous to public safety, infrastructure and other property had arisen.
Whether any of these erring dams’ EAPs have adequate provisions for mitigating loss to life and property in the downstream areas is something that everyone responsible for helping putting these EAPs in place should be held responsible for. In fact all the EAPs must be in public domain and should be shared in manner that local vulnerable communities can understand.
Another question that begs answer is about the accountability of dam authorities if the development in downstream areas is on flood plains of the river? Should dam owners be held responsible for contributory negligence about not raising an alarm about unregulated, indiscriminate development in their downstream areas?
Should the dam operators not be warned about the changing carrying capacity of the river downstream from the dam due to enroachments on floodplains or reduced carrying capacity due to other reasons like dumping of solid wastes?

Sine qua non for effective flood control

Two important aspects that are in fact sine qua non and can significantly strengthen our response to any emergency of the type that was witnessed in HP are; flood plain zoning of the rivers and effective and efficient catchment area treatment (CAT) plans.
All dams have CAT plans made for their catchment area as a part of their EIA but how effectively they deal with the issues is a matter of investigation. To what extent the CAT are implemented and how well they are implemented, how adequate the CAT are, are some relevant questions that both developers and regulators need to answer.
Sedimentation load in the river and in the reservoirs is an indication of the health of catchment area. In HP it was witnessed that the carrying capacity of the river has also been adversely impacted by indiscriminate dumping in the river and more discharge in the river is often associated with higher sedimentation.
As per Black’s Law dictionary (6th Edn., p.641) floodplain is the land adjacent to rivers, which, because of its level topography, floods when river overflows. Flood plain zoning has been recognized as an effective non-structural measure for flood management.
Flood-plain zoning measures aim at demarcating zones or areas likely to be affected by floods of different magnitude or frequencies and probability levels, and specify the types of permissible developments in these zones, so that whenever floods actually occur, the damage can be minimised.
Keeping in mind the increasing unpredictability of rainfall pattern and incidence of more frequent extreme rainfalls, the definitions of the once-in-25-year-flood and once-in-100-year-flood need to be revised and implement changes in our floodplain zoning policies and practices, though unfortunately we have no confidence inspiring policies or practices.
Floodplain zoning guidelines and laws The Central Water Commission (CWC) prepared floodplain zoning guidelines and the Model Bill for Floodplain Zoning in 1975, though CWC has done nothing confidence inspiring in ensuring implementation of such policies. Four states enacted floodplain zoning acts: Manipur in 1978, Rajasthan in 1990, Jammu and Kashmir in 2005 and Uttarakhand in 2012, though none of the states have effectively implemented such Acts.
These Acts provide for the establishment of a Flood Zoning Authority which is authorised to conduct surveys to determine the nature of extent of floodplains, prohibit or restrict the use of land in the floodplains, and impose penalties for non-compliance.
In Manipur delimitation of flood zones, prohibiting construction activities, was performed by the state government through a notification in 1988. The Uttarakhand government started demarcating floodlines in 2020. However neither Uttarakhand nor Manipur are known to have implemented the regulations effectively. Demarcation of floodlines and enforcement of floodplain zoning has not been done in the other two states where floodplain zoning laws have been passed, i.e., Rajasthan and Jammu and Kashmir (now a union territory).
National Green Tribunal (NGT) order on floodplains In the state of HP there is no such law which mandates flood plain zoning except the decision of the NGT which has to be followed. NGT vide its order/judgment dated 10.12.2015, in OA No 200 of 2014 M.C. Mehta vs Union of India and Ors. has inter-alia directed that as an interim measure, at least 100m from middle of the river would be treated and dealt with as ‘Eco sensitive and prohibited zone’.
It said, no activity whether permanent or temporary in nature will be permitted to be carried on in this zone including camping. The area beyond 100 meters and less than 300 meters would be treated as regulatory zone in the hilly terrain, for which the State will comply with the above directions.
Further vide its order dated 15.12.2017, NGT directed that no construction would be permitted in the Flood Plain in consonance with the judgement of the Tribunal in the case of Indian Council for Enviro-Legal Action Vs. National Ganga River Basin Authority & Ors.
NGT reiterated that in the area falling within 50 mtrs from edge of the river in the hilly terrain, no construction would be permitted, nor any other activity carried out and it shall be treated as Prohibitory Zone. Beyond 50 mtrs and up to 100 mtrs in the hilly terrain it shall be treated as Regulatory Zone.
Regulatory activity shall be notified by the State and till that time there shall be no construction activity permitted in that area. Once the river enters the plain or even hilly areas where width of the river is more than 70 mtrs, in that event area of 100 mtrs from the edge of the river shall be treated as Prohibitory Zone while 100 mtrs to 300 mtrs would be treated as Regulatory Zone and till the time the State notifies the restricted activities, there shall be no construction activity even in the regulatory zone.
We need a holistic view and a comprehensive strategy in place if we want to reduce the impact of such incidents as were witnessed in 2023 in HP in future. The notices given to 21 dam operators should be put in public domain and taken to their logical conclusion, fixing the accountability. Since the 21 operators include those from central, state and private sector, all sectors can be put on notice to improve their operations.
Where there are lapses in state government functioning, including monitoring and compliance that should also be addressed. The  National Highway Authority of India  (NHAI), which has been also put on notice for encroaching on Beas river bed, need to be also held accountable for the muck dumping in the rivers, as determined by the High Court.
The state dam safety institutions need to become much more transparent and they can in fact show the path for the rest of the country. On floodplain zoning policies and practices, HP can start with rigorously implementing the NGT orders and also brining its own policy and regulations.
All this becomes even more imperative and urgent considering the changing climate, the rainfall this year in HP is a rude reminder of that.
Dam authorities have to be more transparent & vigilant themselves and about dam owners discharging their responsibility regarding dam safety with utmost care. The system needs to be cognisant of hazard creep and keep that in check. 
Flood plain zoning of rivers is something that needs to be done on war footing to manage floods and reduce future damages to our future development and also to reduce the hazard creep.
---
Archana Vaidya is Natural Resource Management & Environment Law Consultant, Himanshu Thakkar is with South Asia Network on Dams, Rivers and People (SANDRP). Source: SANDRP

Comments

TRENDING

70,000 migrants, sold on Canadian dream, face uncertain future: Canada reinvents the xenophobic wheel

By Saurav Sarkar*  Bikram Singh is running out of time on his post-study work visa in Canada. Singh is one of about 70,000 migrants who were sold on the Canadian dream of eventually making the country their home but now face an uncertain future with their work permits set to expire by December 2024. They came from places like India, China, and the Philippines, and sold their land and belongings in their home countries, took out loans, or made other enormous commitments to get themselves to Canada.

Kerala government data implicates the Covid vaccines for excess deaths

By Bhaskaran Raman*  On 03 Dec 2024, Mr Unnikrishnan of the Indian Express had written an article titled: “Kerala govt data busts vaccine death myth; no rise in mortality post-Covid”. It claims “no significant change in the death rate in the 35-44 age group between 2019 and 2023”. However, the claim is obviously wrong, even to a casual observer, as per the same data which the article presents, as explained below.

PM-JUGA: Support to states and gram sabhas for the FRA implementation and preparation and execution of CFR management plan

By Dr. Manohar Chauhan*  (Over the period, under 275(1), Ministry of Tribal Affairs has provided fund to the states for FRA implementation. Besides, some states like Odisha, Chhattisgarh and Maharashtra allocated special fund for FRA implementation. Now PM-JUDA under “Dharti Aaba Janjatiya Gram Utkarsh Abhiyan(DAJGUA) lunched by Prime Minister on 2nd October 2024 will not only be the major source of funding from MoTA to the States/UTs, but also will be the major support to the Gram sabha for the preparation and execution of CFR management Plan).

Operation Kagar represents Indian state's intensified attempt to extinguish Maoism: Resistance continues

By Harsh Thakor Operation Kagar represents the Indian state's intensified attempt to extinguish Maoism, which claims to embody the struggles and aspirations of Adivasis. Criminalized by the state, the Maoists have been portrayed as a threat, with Operation Kagar deploying strategies that jeopardize their activities. This operation weaves together economic, cultural, and political motives, allegedly with drone attacks on Adivasi homes.

How Amit Shah's statement on Ambedkar reflects frustration of those uncomfortable with Dalit assertion, empowerment

By Vidya Bhushan Rawat*  Dr. B.R. Ambedkar remains the liberator and emancipator of India’s oppressed communities. However, attempts to box him between two Brahmanical political parties betray a superficial and self-serving understanding of his legacy. The statement by Union Home Minister Amit Shah in the Rajya Sabha was highly objectionable, reflecting the frustration of those uncomfortable with Dalit assertion and empowerment.

Balod tech fest tests students’ interest in innovative ideas in the fields of science, engineering, start-ups

By Our Representative  A techno fest scheduled on December 20 and 21 in Balod district of Chhattisgarh will test the innovative ideas of school students in the fields of science, engineering and start-ups.  For this two-day fest organised at Maheswari Bhawan of the district, a total of 824 models made by students were initially registered. Out of those, a selection committee chose 200 models from several schools spread over five blocks of Balod. These will be on display on these two days from 10am to 4.30pm. Out of many ideas, one of the most interesting models is a smart glove which can be used by children with impairments and disabilities. For those who cannot speak at all or have speech difficulty, they can ask for help from caregivers by pressing their fingers on the glove after wearing it. This will attract attention. 

Defeat of martial law: Has the decisive moment for change come in South Korea?

By Steven Lee  Late at night on December 3, soldiers stormed into South Korea’s National Assembly in armored vehicles and combat helicopters. Assembly staff desperately blocked their assault with fire extinguishers and barricades. South Korea’s President Yoon Suk Yeol had just declared martial law to “ eliminate ‘anti-state’ forces .”

Ideological assault on dargah of Sufi Saint Khwaja Moinuddin Chishti will disturb pluralistic legacy: Modi told

Counterview Desk Letter to the Prime Minister about "a matter of the utmost concern affecting our country's social fabric": *** We are a group of independent citizens who over the past few years have made efforts to improve the deteriorating communal relations in the country. It is abundantly clear that over the last decade relations between communities, particularly Hindus and Muslims, and to an extent Christians are extremely strained leaving these latter two communities in extreme anxiety and insecurity.

Affable but arrogant, embodying contradictions, Raj Kapoor's legacy will endure as long as Bollywood exists

By Harsh Thakor*  December 14 marks the birth centenary of Raj Kapoor, a filmmaker and visionary who revolutionized Bollywood, elevating it to new heights by exploring uncharted emotional and social territories. Kapoor wasn’t just a filmmaker; he was a storyteller who touched the souls of the masses and reflected the pulse of post-partition India with unparalleled depth. His films acted as a unifying force in a divided nation, transcending social and cultural boundaries.

Suspicious death of Dalit laborer in BSF custody: A call for justice

By Kirity Roy*  The tragic and suspicious death of Mr. Babai Barui, a Dalit daily wage laborer from North 24 Parganas, West Bengal, has raised serious concerns regarding custodial violence and the violation of fundamental rights. Mr. Barui, son of Sukharanjan Barui, resided in Pallishree Sangsad, Bongaon, and was arrested by the Border Security Force (BSF) on November 9, 2024, near the Angrail border on allegations of smuggling. The very next day, he was found dead under mysterious circumstances, with visible injuries that point toward possible custodial violence.