Skip to main content

State-supported report warns of disaster in special situations because of Rs 4,000 crore Bharbhut barrage

Counterview Desk
The new state-sponsored report, “Environmental Impact and Risk Assessment for the Proposed Barrage across River Narmada near Bhadbhut, Dist. Bharuch”, by Government of India consultants National Environmental Engineering Research Institute (NEERI), has insisted on a “study of catastrophic flooding that may occur in the event of barrage … failure is of great concern and importance because of the risk of life and property in the down stream of the structure.” The report has been prepared for discussion at the environmental pubic hearing on the Rs 4,000 crore Bharbhut project, to take place on July 19 near Bharbhut.
The report, which is environmental impact assessment study of the barrage to be built across Narmada river's month next to the Bay of Khambhat, says, “The statistics on dam/barrage failure during the last one century show about 200 major dam failures resulting in the death of more than 11,000 people. However, their distribution is uneven throughout the world. Some of these dam failures have occurred in India also and MachhuDam (Morvi, Gujarat) in 1979 is one of the glaring examples, which took a toll of 2,000 lives and caused enormous loss to property.”
Keeping in view the adverse effects of dam break on human population, loss of property and environment in and around the areas of impact of the dam break, the report wants the Gujarat government to “assess the possibility of such failures and formulate a plan of management. Apart from the inherent hazard potential of dam, the risk may get compounded due to the occurrence of natural events like an unprecedented runoff, earthquake, etc.”
The report says, “Records have shown that few dam failures are on account of earthquakes, whereas large number of partial or complete failure of dams is due to unprecedented floods. Therefore, there exists a need for an emergency evacuation plan to lessen or mitigate its impact upon human habitation and property.”
Coming specifically to Bharbhut, which is proposed to be built on the mouth of Narmada river, the report says, once the barrage is built, ”in normal situation, the river water will get stored up to 7.5 metres height, which is the full reservoir level (FRL) in the upstream of the barrage.” As for the downstream, “flow of the river water will be limited to environmental flow.”
Against this backdrop, the report says, “since the tidal water flow will be predominant in reverse to present regime of the predominant river water flow, the tidal flow dominated hydrodynamic condition will bring about morphological change in the downstream estuary from the uniformly shaped form to the irregularly shaped tidal estuarine form. Moreover, the tidal water on getting reflected from the barrage will rise to a higher level and spread over a larger area.”
The Aliabet island, which is in the mouth of Narmada river, at the spot where the river merges into the sea, “may face the problem of erosion”, the report says, adding, “In post barrage scenario, the increase in tidal water level concomitant with the increase in the spread of tidal water area will be accompanied with reduction in the flow velocity of tidal water. In consequence, sedimentation will increase and the tidal transmission will have increasingly irregular and aggravating characteristics.”
Of the two Narmada estuary channels, the report says, “the western channel is already silted up, and its siltation levels will get further aggravated.” The existing mud island of Aliabet having the elevation of El. 4.0 m to 7.0 m form the left bank of the estuary and is presently stabilized. “Any erosion of the Aliabet will not only destabilize it but will also contribute materials for increased sedimentation. As regard erosion of estuary banks, “the Ministry of Environment and Forests, Government of India, has launched final report on shoreline changes for Gujarat coast prepared by the Institute of Ocean Management (IOM), Anna University, Chennai, in January 2011.”
The study identifies shoreline changes in the coastal districts have been classified into four categories -- stable coast, low erosion coast, medium erosion coast, and high erosion coast. “The barrage location falls in Hansot taluka on left bank and Vagra taluka on right bank of Bharuch district. The area of Bharuch district comes under three of the four categories -- high erosion, medium erosion and low erosion categories. One village of Hansot taluka falls under medium erosion category and eight villages of Vagara taluka fall under low erosion category.”
The study recommends that to overcome the erosion in the downstream estuary will have to be appropriately trimmed and the channel bed will have to be properly graded to impart non-silting velocity. “By adopting this measure, estuary water will remain confined within the banks and flow smoothly without undue sedimentation”, the report states.
During the monsoon months, the accumulated flood would have be released by opening the gates. As the large flood volume will have concentrated flow, the increased flow velocity resulting thereof “will flush out the estuary bed sediments.” After sediment removal, “the western Aliabet channel, which is presently silted up, will get cleared and become functional.”
Further, it is also likely, the report states, “that the increased tidal motion will cause deepening and widening of the estuary channel which will help accommodate larger flood volume and also facilitate easier exit of flood water. Under the improved condition of channel flow, Aliabet will not be subjected to erosive forces.”
Pointing towards yet another risk, the report points out, “Narmada river flood is the most significant risk”. It says, “At the highest flood level of 8.31 metres observed at Bhadbhut in 1970, the maximum flood discharge of 27 lalj cusecs was estimated, which caused full to partial flooding in low lying areas of 17 villages on the left bank of the river. According to present estimate, the total flood discharge at the Bhadbhut barrage is considered as 1,02,364 cubic metres per second or cumecs, or 36.15 lakh cubic feet per second (cusecs). After barrage construction, “because of the flood discharge of 36.15 lakh cusecs and incidental afflux, the flood can be anticipated to cause damage in the left bank areas”.
While such upstream dams such as Indira Sagar, Omkareshwar and Maheshwar in Mandhya Pradesh, and the Narmada dam in Gujarat can absorb flood waters, reducing the “probability of occurrence of high flood is reduced considerably”, at the FRL of 7.5 mtres, the height of the protective embankment will have to be 1.0 mtres above the high flood level (HFL). The report adds, “Having the provision of river widening and sufficiently raised embankment, adequate space will be made available for accommodating the incoming flood within the confines of the river banks fortified with the embankment.”
Even then, the report underlines, “disposal of flood at Bhadbhut barrage site will be contingent upon the tidal situation. During the no tide period, on receipt of early flood release signal from the Narmada dam site, the barrage gates will be opened in advance so as to empty the upstream reservoir as per the requirement of storage space to accommodate the incoming flood. The barrage storage capacity is estimated as 450 Mm³. This quantity could be evacuated during no tide condition in 6.5 hours if the gates are opened for 20,000 cumecs.”
In an extreme situation, the report says, ”since the barrage gates will remain closed for this condition, the reflection of the tide will cause the further rise in tide level. In this situation, the flood water level in the upstream is likely to rise to above the FRL.” But considering the development of numerous water resource projects, particularly Indira Sagar, Omkareshwar, Maheshwar and the Narmada dam, the report claims, “in recent times, a considerable moderation of flood discharge is all likely and the probability of occurrence of the above stated extreme situation is least likely.”
The risks nevertheless do exist, one reason why one should set up alarms and warning systems, even as addressing “both hardware and software aspects” which ne to be “integrated into the design of emergency management.”A contingency plan or disaster management plan for dam failures should be kept ready. This plan would serve as a reference document consisting of salient information indicating the actions to be taken at the time of disaster, and hence, it has to be made as comprehensive as possible and it needs to be tested and updated periodically.”
The objectives of the plan, according to the report, could be:
• Timely warnings and alerts
• Assess the damage potential
• Delineate emergency action and procedures
• Delineate emergency organization and first response/action teams
• Define roles and responsibilities
• Delineate procedures for mitigation and control of incident
• Delineate access routes and safe locations
• Delineate emergency action

Comments

TRENDING

राजस्थान, मध्यप्रदेश, पश्चिम बंगाल, झारखंड और केरल फिसड्डी: जल जीवन मिशन के लक्ष्य को पाने समन्वित प्रयास जरूरी

- राज कुमार सिन्हा*  जल संसाधन से जुड़ी स्थायी समिति ने वर्तमान लोकसभा सत्र में पेश रिपोर्ट में बताया है कि "नल से जल" मिशन में राजस्थान, मध्यप्रदेश, पश्चिम बंगाल, झारखंड और केरल फिसड्डी साबित हुए हैं। जबकि देश के 11 राज्यों में शत-प्रतिशत ग्रामीणों को नल से जल आपूर्ति शुरू कर दी गई है। रिपोर्ट में समिति ने केंद्र सरकार को सिफारिश की है कि मिशन पुरा करने में राज्य सरकारों की समस्याओं पर गौर किया जाए। 

Beyond his riding skill, Karl Umrigar was admired for his radiance, sportsmanship, and affability

By Harsh Thakor*  Karl Umrigar's name remains etched in the annals of Indian horse racing, a testament to a talent tragically cut short. An accident on the racetrack at the tender age of nineteen robbed India of a rider on the cusp of greatness. Had he survived, there's little doubt he would have ascended to international stature, possibly becoming the greatest Indian jockey ever. Even 46 years after his death, his name shines brightly, reminiscent of an inextinguishable star. His cousin, Pesi Shroff, himself blossomed into one of the most celebrated jockeys in Indian horse racing.

How the slogan Jai Bhim gained momentum as movement of popularity and revolution

By Dr Kapilendra Das*  India is an incomprehensible plural country loaded with diversities of religions, castes, cultures, languages, dialects, tribes, societies, costumes, etc. The Indians have good manners/etiquette (decent social conduct, gesture, courtesy, politeness) that build healthy relationships and take them ahead to life. In many parts of India, in many situations, and on formal occasions, it is common for people of India to express and exchange respect, greetings, and salutation for which we people usually use words and phrases like- Namaskar, Namaste, Pranam, Ram Ram, Jai Ram ji, Jai Sriram, Good morning, shubha sakal, Radhe Radhe, Jai Bajarangabali, Jai Gopal, Jai Jai, Supravat, Good night, Shuvaratri, Jai Bhole, Salaam walekam, Walekam salaam, Radhaswami, Namo Buddhaya, Jai Bhim, Hello, and so on. A soft attitude always creates strong relationships. A relationship should not depend only on spoken words. They should rely on understanding the unspoken feeling too. So w...

Aurangzeb’s last will recorded by his Maulvi: Allah shouldn't make anyone emperor

By Mohan Guruswamy  Aurangzeb’s grave is a simple slab open to the sky lying along the roadside at Khuldabad near Aurangabad. I once stopped by to marvel at the tomb of an Emperor of India whose empire was as large as Ashoka the Great's. It was only post 1857 when Victoria's domain exceeded this. The epitaph reads: "Az tila o nuqreh gar saazand gumbad aghniyaa! Bar mazaar e ghareebaan gumbad e gardun bas ast." (The rich may well construct domes of gold and silver on their graves. For the poor folks like me, the sky is enough to shelter my grave) The modest tomb of Aurangzeb is perhaps the least recognised legacies of the Mughal Emperor who ruled the land for fifty eventful years. He was not a builder having expended his long tenure in war and conquest. Towards the end of his reign and life, he realised the futility of it all. He wrote: "Allah should not make anyone an emperor. The most unfortunate person is he who becomes one." Aurangzeb’s last will was re...

PUCL files complaint with SC against Gujarat police, municipal authorities for 'unlawful' demolitions, custodial 'violence'

By A Representative   The People's Union for Civil Liberties (PUCL) has lodged a formal complaint with the Chief Justice of India, urging the Supreme Court to initiate suo-moto contempt proceedings against the police and municipal authorities in Ahmedabad, Gujarat. The complaint alleges that these officials have engaged in unlawful demolitions and custodial violence, in direct violation of a Supreme Court order issued in November 2024.

Incarcerated for 2,424 days, Sudhir Dhawale combines Ambedkarism with Marxism

By Harsh Thakor   One of those who faced incarceration both under Congress and BJP rule, Sudhir Dhawale was arrested on June 6, 2018, one of the first six among the 16 people held in what became known as the Elgar Parishad case. After spending 2,424 days in incarceration, he became the ninth to be released from jail—alongside Rona Wilson, who walked free with him on January 24. The Bombay High Court granted them bail, citing the prolonged imprisonment without trial as a key factor. I will always remember the moments we spent together in Mumbai between 1998 and 2006, during public meetings and protests across a wide range of issues. Sudhir was unwavering in his commitment to Maoism, upholding the torch of B.R. Ambedkar, and resisting Brahmanical fascism. He sought to bridge the philosophies of Marxism and Ambedkarism. With boundless energy, he waved the banner of liberation, becoming the backbone of the revolutionary democratic centre in Mumbai and Maharashtra. He dedicated himself ...

Censor Board's bullying delays 'Phule': A blow to India's democratic spirit

By Vidya Bhushan Rawat*  A film based on the life and legacy of Jyotiba Phule and Savitribai Phule was expected to release today. Instead, its release has been pushed to the last week of April. The reason? Protests by self-proclaimed guardians of caste pride—certain Brahmin groups—and forced edits demanded by a thoroughly discredited Censor Board.

State Human Rights Commission directs authorities to uphold environmental rights in Vadodara's Vishwamitri River Project

By A Representative  The Gujarat State Human Rights Commission (GSHRC) has ordered state and Vadodara municipal authorities to strictly comply with environmental and human rights safeguards during the Vishwamitri River Rejuvenation Project, stressing that the river’s degradation disproportionately affects marginalized communities and violates citizens’ rights to a healthy environment.  The Commission mandated an immediate halt to ecologically destructive practices, rehabilitation of affected communities, transparent adherence to National Green Tribunal (NGT) orders, and public consultations with experts and residents.   The order follows the Concerned Citizens of Vadodara coalition—environmentalists, ecologists, and urban planners—submitting a detailed letter to authorities, amplifying calls for accountability. The group warned that current plans to “re-section” and “desilt” the river contradict the NGT’s 2021 Vishwamitri River Action Plan, which prioritizes floodpla...

CPM’s evaluation of BJP reflects its political character and its reluctance to take on battle against neo-fascism

By Harsh Thakor*  A controversial debate has emerged in the revolutionary camp regarding the Communist Party of India (Marxist)'s categorization of the Bharatiya Janata Party. Many Communists criticize the CPM’s reluctance to label the BJP as a fascist party and India as a fascist state. Various factors must be considered to arrive at an accurate assessment. Understanding the original meaning and historical development of fascism is essential, as well as analyzing how it manifests in the present global and national context.

Implications of deaths of Maoist leaders G. Renuka and Ankeshwarapu Sarayya in Chhattisgarh

By Harsh Thakor*  In the wake of recent security operations in southern Chhattisgarh, two senior Maoist leaders, G. Renuka and Ankeshwarapu Sarayya, were killed. These operations, which took place amidst a historically significant Maoist presence, resulted in the deaths of 31 individuals on March 20th and 16 more three days prior.